When is a Pre-Application Meeting Required?

A Pre-Application Meeting is required prior to submittal of any of the following project examples:

  • Any new non-residential development 
  • Expansion of existing non-residential building(s)
  • Construction or expansion of any multi-family residential structure(s)
  • Subdivision 
  • Exterior remodeling and/or site work on commercial or multi-family properties
  • Variance
  • Special Use Permit

Submit a Pre-Application Form 

The City of Westminster utilizes eTRAKiT, an online software tool, to facilitate the development review process.  This system provides access for you to:

Visit the eTRAKiT webpage to upload all of your required documents:

ETRAKIT

You will also attach the following required information to your online submittal: 

 

Describe your project and include the following information:

  • Proposed uses and a detailed description of each
  • Number of dwelling units (if residential) 
  • Gross floor area for each buildings
  • Number of floors and building height
  • Estimated building construction costs (building valuation)
  • Hours of operation (if Special Use Permit)
  • Hours of operation (if Special Use Permit)
    • Provide conceptual elevation drawing/massing for each structure and outdoor activity to be built or retained on site
    • Identify primary entrance and proposed secondary entrance
    Proposed on-site structures and improvements including:

    • Street and landmark labels, scale, north arrow, and date
    • Dimensions and area of the project site
    • All proposed structures (including those that will be retained)
    • All proposed driveways, off-street parking and loading areas (including those that will be retained)
    •  All proposed landscape/hardscape areas (including those that will be retained)
      1. Identify any existing clusters of tree
    • Location and dimensions of existing and proposed streets, right-of-way and public/private access easements on and adjoining the site
    • Location and dimensions of all existing and proposed above ground and below ground utilities
      1. Approximate location of existing fire hydrants within a 100´ radius of site
      2. Proposed method of providing stormwater drainage
      3. Proposed grading activity for the site, indicating areas of proposed cuts and fills
    • Location and dimensions of proposed lot(s)

    Schedule and Attend a Pre-Application Meeting

    Please note, the Principal Planner may waive the Pre-Application meeting requirement after initial review of the Pre-Application meeting request and submittal materials. 

    Pre-Application meetings are scheduled after the application and all submittal requirements have been received and verified by the Planning Division. Your submittal will be verified within 2 business days of the date of submittal. Once verified, you will be contacted to schedule the Pre-Application meeting. The Pre-Application meeting will be scheduled between 5 -10 business days from your submittal date.  

    Staff will provide the following feedback based on the information submitted prior to the meeting:
    • General information regarding the City of Westminster’s unique development processes;
    • Contact information, applicable codes, applications, and fees, site specific information related to your submittal;
    • A detailed summary of the meeting will be provided within 5 business days of the Pre-Application meeting 
    Any person associated with a development proposal should attend the meeting (property owner, project manager, design professionals, etc). The meeting will be led by the Principal Planner and staff from the Engineering Division and Public Works Department. Other City of Westminster staff, including representatives of the Building Division, Fire Department, and Economic Development Department may also attend the meeting.
    Please be advised that project approvals will not be given at this stage. This meeting is designed as an advisory step to prepare the applicant for a formal submittal. 

    ADDITIONAL INFORMATION 

    Xcel Energy Design Assistance Program

    This opportunity is too good to pass up! Xcel is offering an assistance program that helps you include energy savings in the planning and design phase of your project.  Xcel will even offer rebates based on energy savings gained!

     If you have additional questions regarding the planning approval process or to schedule an informal consultation, please contact the Planning Division at: planning@cityofwestminster.us or call 303-658-2092.